MULTIPLE ISSUES ON A SHORT LIFE HIGH TEMP BELT

Case Studies - Multiple Issues on High Temp Belt example.

MULTIPLE ISSUES ON A SHORT LIFE HIGH TEMP BELT

Case Studies - Multiple Issues on High Temp Belt example.

SITUATION:

WMP received two belt samples from a source that were representative of the initial belt used in a new high temperature furnace that was experiencing rapid stretching and unusual spiral distortion. The first sample was a small piece (approximately 2″) of a right-hand spiral while the second sample was a full width piece with both left and right hand spirals.

Fill out the form for complete case study findings and results.

"*" indicates required fields

Name*
No Comments

Sorry, the comment form is closed at this time.